Only 12 Metro Rail Transit (MRT) 3 trains may be left running once the Japan-led rehabilitation project for the entire system starts next year, according to the Department of Transportation (DOTr).
The limited number of operational trains, which might once again result in long lines at stations, emphasized the need to get the 48 brand new China-made trains running as soon as possible, Transport Secretary Arthur Tugade said on Tuesday.
Generic medicines are much more affordable than brand name medicines (such as: cialis 50mg, cialis, cialis 10 mg and much more), and drastically reduced prices. Before buying this ultra-important male impotence drugs from any online drug store or local drug store. * Kamagra bestellen online as the online drug stores sell tadalafil 5mg no prescription these drugs without demanding a prescription. Chronic stress is a true antagonist to levitra line pharmacy our health and wellness. The payment would be calculated viagra prescription based on performance, and the utilization of active surveillance during the period.
READ MORE: Inquirer